Blog
- Building A, Republic International Business Plaza, No. 3699 Gonghexin Road, Jing'an District, Shanghai
- +86-21-59175887
- market@soctfiber.com
- 86-17321363317
- 86-13341796231
With the rapid development of information technology, fiber optic cable systems have become increasingly critical in modern communications. As a new type of compact optical cable structure, micro-bundled cables demonstrate
Still struggling with old, congested ducts?Traditional fiber construction often means trenching, service shutdowns, and skyrocketing costs—like performing “open-heart surgery” on a city. According to the China Academy of Information and
If you’re building or upgrading 4G/5G sites, hybrid fiber-power cable lets you deliver CPRI/eCPRI data + DC power to the RRU through a single run—fewer pulls, fewer trays, faster turn-ups.
Utilities upgrading transmission corridors need one conductor that shields the line and carries bandwidth for protection relays, SCADA and backbone traffic. OPGW-48B1-100 integrates a 48-fiber optical unit inside a metallic
Looking to add high-density fiber with minimal trenching and fast turn-ups? SOCTFiber supplies air-blown micro-duct systems and micro-cables engineered for clean, long shots in 5/3.5, 7/5.5, 8/6, 10/8, 12/10 mm
When designing and selecting fiber optic cables, it is essential to choose materials based on actual application requirements. Today, let’s briefly discuss several commonly used materials in fiber optic cable
Looking for a utility-grade, dielectric aerial cable you can hang directly on poles—without metallic mess or live-line safety risks? SOCTFiber’s ADSS (All-Dielectric Self-Supporting) cables cover 12–144 cores, built for power
In our fiber optic projects, the products we work with most frequently are optical fibers and fiber optic cables. Many of our colleagues often mention the use of devices such
Are you struggling with high insertion loss, connector incompatibility, or long customization lead time? SoctFiber provides selection guidelines and practical solutions for fiber optic network engineers, data center purchasers, research
Process 1: Cable Laying 1.Pre-Shift Roll Call Before construction, all personnel gather at the worksite entrance for attendance and check tools. The construction supervisor gives a safety briefing, clarifying the

